A complex of works was carried out on the reconstruction and modernization of the third cooling circuit of the reactor, which includes a water softening station with a capacity of 250 m3 per hour. Work was carried out at the pumping station of the third cooling circuit as well as repair of a pipeline with a diameter of 1200 mm with a total length of 3500 meters.

As part of the reconstruction of the PIK facility in the period from 2010 to 2018, a complex of works was carried out to repair buildings and structures, heating systems, individual heating points, etc., external water supply and sanitation networks, ventilation systems, as well as building facades.

The complex construction of stormwater treatment facilities with a total capacity of 1800 liters per second was carried out on the territory of the PIK of the St. Petersburg Institute of Nuclear Physics named after B. P. Konstantinov.